RPC-160

3

neutralized.png
Oa5Cn5B.png

Still image taken from body cam footage of MSF Theta-7 showing RPC-160. Recorded during initial discovery.

Registered Phenomena Code: 160

Object Class: Neutralized

Hazard Types:

Containment Protocols: A camera feed is to be on and recording the room where RPC-160 resided before its neutralization at all times. Listening post-Alpha-11 and its subsidiaries, listening posts Alpha-11-A through D, are to monitor for a possible reemergence of RPC-160. The armory within Site-95 is to be stocked with bulletproof vests, military-grade hearing protection, and submachine guns equipped with extended magazines.

The hospital where RPC-160 was discovered has been shut down and is now designated Non-Anomalous Storage Site-95. A standard security team is to guard the site as per standard storage site procedures. Along with their regular duties, members of this security team are to be aware of the containment procedures listed above.

Description: RPC-160 is a localized void 2.8 meters in diameter. After initial discovery, RPC-160 was found to be slowly decreasing in size. The rate at which the volume of RPC-160 was decreasing was not determined before its neutralization. Testing was done by MSF personnel to see how RPC-160 reacted to firearm damage. This testing was done without authorization1. When fired upon, RPC-160 exhibited a sudden increase in volume, which was followed by a more significant decrease in volume2. Any rounds fired at RPC-160 seemed to disappear within and were not recovered. RPC-160 shrank out of existence 174 minutes after discovery.

Discovery: The Authority first began searching for RPC-160 on 01/25/19██ when seven of the instruments at listening post Alpha-11 simultaneously began recording levels above their maximum detection levels, including [REDACTED]. Additionally, the on-site spectrometer, which detects fluctuations in the ██████ █████████ ██████████, detected an additional [DATA EXPUNGED]. Readings from all devices lasted for approximately 4 minutes, 53 seconds before abruptly disappearing. This detection event is designated RPC-160-DE-1. The origin of the readings could not be found due to the short amount of time of detection and the lack of quality instruments3.

After RPC-160-DE-1, four additional listening posts were constructed, designated listening posts Alpha-11-A through D, in an 8 km square around Listening Post Alpha-11 to triangulate the location of the anomaly using detection times of certain instruments affected during RPC-160-DE-1.

On 4/30/19██, readings identical to RPC-160-DE-1 were detected for 7 minutes, 23 seconds, detection designated as RPC-160-DE-2. Triangulation from all five sites was successful. MSF Theta-7, "Metal Detectors" discovered RPC-160 213 minutes after RPC-160-DE-2 began.

The area that was cordoned off from the rest of the hospital is designated RPC-160-A

Addendum RPC-160-A: The Authority was able to track down staff of the hospital from records found within the facility. Those interviewed reported that an armed security force guarded RPC-160-A for ██ years. All interviewed knew that there were operations underground but nothing further. Based off these interviews, it appears the hospital was shut down the week RPC-160-DE-2 occurred for 'maintenance.' Long time staff at the hospital reported that there was an evacuation on the same day as RPC-160-DE-1.

Addendum RPC-160-B: On 4/11/20██, the Authority was contacted by an individual named Al █████ via [REDACTED]. They claimed to have worked as security personnel at [REDACTED], where RPC-160 was found. The Authority arranged a meeting and apprehended Al █████ without any resistance. Once apprehended, Al █████ insisted on an interview with, "the most important guy you got."

« RPC-160 | RPC-160| RPC-160 »

Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License