Site-001

Site-001 is a large maximum security sub-aquatic facility used to contain especially precarious anomalies with mostly Gamma and/or Omega class objects. Access is through a sham oil rig platform for helicopters and/or VTOL aircraft to land on.

tagshow

17

17

cn.png


site-header-white.png



Site-001

Maximum Security Subaquatic Containment Facility


Overview


Entrance

The entrance of Site-001 photographed from the deck of AS Andromeda, 16/01/2018.

Established: 16th January, 1985.

Front Cover: Offshore Oil Rig

Location: Area 01A, 168.63 km kilometers north-northeast off of Henderson Pitcairn Island, South Pacific Ocean. (22°50'52.7"S 128°38'09.1"W)

Codename: "Storm Fortress"

Hex-code: [01]

Site Occupation: Primary Containment, Research, and CSD Holding Facility.

Division Jurisdiction: Research and Containment

Total Area:

  • 90,000 m2 (Site)
  • 4,000,000 m2 (Torpedo netting perimeter)
  • 400,000,000 m2 (Airspace defense range)

Background Information: Site-001 is a large maximum security sub-aquatic facility used to contain especially precarious anomalies with mostly Gamma and/or Omega class objects. Access is through a sham oil rig platform for helicopters and/or VTOL aircraft to land on. Only personnel with security clearance of Level 4 or higher and/or authorized selected personnel may be granted passage to enter the site.

Site-001 is powered by █ Uranium U-235 Pressurized Heavy-water Reactors and is defended with several on-site anti-aircraft and close-in weapon systems, such as the 20x102mm Block 1B Phalanx CIWS, complemented with several RIM-67D SM-2ER Block IIIC surface-to-air and anti-ship missiles. The 300x300m area of Site-001 is protected by anti-submarine and anti-torpedo netting. Site-001's main containment facility is located 300 meters underneath the sea level. In the case of a containment breach, all of Site-001's containment sector can be flooded with seawater in less than 20 seconds.

The construction of Site-001 can be traced back to 1928, where the Overman Committee attempted to fully remove Authority presence within the United States. Due to the sudden influx of anomalies transferred from mainland Europe to North America during the World War 1, The Authority needed to construct a facility large enough to contain these anomalies. This leads to the initiation of Project Sanctuary, where the Authority would attempt to negotiate with various governments to grant them land area to build containment sites.

However, 94% of the negotiations would prove to be unfruitful and as such, the Authority turned to Area 01, a shallow underwater volcanic rock formation located in the international waters of the South Pacific Ocean. The projected cost at the time was simply too high, in addition to the shortages of supplies, as the economies of various countries were still recovering from the previous war. Nevertheless, the Authority agreed to scrap most of its fleet and combat assets to fund the construction.

The construction of Site-075 (later re-designated to Site-001 upon its completion in 1985) began in early 1931. However, by late 1930s, United States President Franklin Delano Roosevelt agreed to repeal many of its sentiment anti-occultism policies and allowed the Authority to remain operational in US Soil. Thus, the development of Site-075 was halted and the remaining funds would be diverted to aid Allied operations against Nazi Germany occult operations throughout Europe.


Offices & Wings Section


Main Accommodation Level:

  • Administrative and Office Wing - Features the main office for the Site Director and several other high-ranking personnel. Only personnel with security clearance of Level 5 or higher and/or selected authorized personnel may enter this wing.
  • Medical Wing - Not only used to house critical medical supplies, the Medical Level is also used to store food supplies and features a small kitchen in the case of emergencies. Equipped with intermediate class medical equipment used only to treat on-site injuries.
  • Research and Laboratories Wing - Only features the Anomaly Research Department. Biochemical research and anomaly experimentation are in limited practice in Site-001 due to safety concerns.
  • Security Wing - Used to house ASF personnel and store several on-site RPC object specific recontainment/handling gear. The elevator shaft leading to the Main Containment Level is equipped with reinforced bulkheads and several redundancies to prevent collateral damage during containment breaches.

Main Containment Level

  • CSD Housing Level — Located just above the Main Containment Level, the CSD Housing Level is used to house a limited number of CSD Personnel (no more than 10 personnel on-site at a time) inside solitary confinement chambers. It is also used as a buffer and a staging area between the surface and the underground levels.
  • Containment Wing, Terran — Used exclusively to contain land-based, air-breathing and hydrophobic anomalies. This level is separated into three sectors based on the objects' classifications: Alpha Sector, Beta Sector and Gamma Sector.
  • Containment Wing, Aquatic — Used exclusively to contain amphibious, maritime and natatorial anomalies. Just like the Terran level, this level is also separated into three sectors based on the objects' classifications: Alpha Sector, Beta Sector and Gamma Sector. The entirety of this level is equipped with several additional bulkheads and emergency pumps in the case of a containment breach.

Site Administration


Administrative Officials:

  • Site Director: Wesley Lindwood
  • Assistant Site Director: Lucia Garnett
  • Dir. of Anomaly Containment: Dr. Marlowe Blaine
  • Dir. of Site Security: Gen. William Scott
  • Dir. of Research & Development: Dr. Reiko Nagase
  • Dir. of Personnel & Management: Francoise Beaumont

On-Site Personnel:

  • Department Heads: 5
  • Administrative Assistants: 13
  • Medical Personnel: 30
  • Research Personnel: 15
  • Security Personnel: 30
  • Maintenance Personnel: 30
  • CSD Personnel: 10

Total: 133


Anomalies Contained


RPC # Additional Information
RPC-002 -
RPC-062 -
RPC-161 -
RPC-333 Managed remotely
RPC-760 To be transferred on ██/██/████
RPC-998 In AH-22

Anomalies Previously Contained


[DATA NOT AVAILABLE]


Sub-Sections




Unless otherwise stated, the content of this page is licensed under Creative Commons Attribution-ShareAlike 3.0 License